North Park Bridge - F03 Bridge and Associated Landscape Plans | QEOP


#21

hi

yes a final design will be installed which include the continuation of the fencing and gates already installed to the north.


#22

Great to hear, though North side at the mo is more temp plastic barriers. Are there any design pictures on the website anywhere? Look forward to the improvements


#23

the railings and entrances being installed where the Park meets Honour Lea Ave and Olympic Park Ave will be the same as the existing railings and entrances around the north of the Park.

Hope that helps.